2016 Adopted Budget
2016 Town of Clayton Budget Read more →
The Town of Clayton’s Route 12 Sewer project needs a 500 gallon horizontal above-ground propane tank to supply a 25kW backup generator. The generator’s gas inlet port is 1” NPTF and 12’ from the proposed tank. The tank’s concrete slab with perimeter bollards has been placed and supply line trench dug by the Town’s sewer contractor.
The Town needs a vendor quote to supply a 500 gallon above ground tank and pressure regulator(s), place and secure the tank to the existing slab, install an underground supply line to the generator, and pressure test.
Installation address: 40616 Marina Road, Clayton, NY 13624
Quotes are due on 24th of September 2018 by 2PM. You may hand deliver or mail to the Town Clerk, 405 Riverside Drive, PO Box 379, Clayton, New York 13624.
2016 Town of Clayton Budget Read more →
Pay Your Town/County Taxes Online Now. PAYMENTS are now accepted... Read more →
2017 Budget 2017 Town of Clayton Budget 2016 Budget 2016... Read more →
Public Notice: Depauville Sewer Rules & Regulations Adoption
PUBLIC NOTICE DEPAUVILLE SEWER RULES & REGULATIONS ADOPTION PLEASE... Read more →
Public Notice: Route 12 Sewer Rules & Regulations Adoption
PUBLIC NOTICE ROUTE 12 SEWER RULES & REGULATIONS ADOPTION ... Read more →
Zoning Board Public Hearing 1/28/19 @7pm Wood Boat Brewery Area Variance
NOTICE OF PUBLIC HEARING Please take notice that the following... Read more →